Overview Final week objectives
The final week is one of the most hectic ones so far. We finished all of our projects and made preparations for the Science Fair.
Project Cover Works and version 2.0 are both finished by installing them and adding the final LED lights, thus also concluding projects Light it up! and Hardware upgrade. Furthermore the last iterations are implemented in the postprocessing program. We worked until the very last second to push through improvements.
Last but not least the Science fair. We designed two posters explaining our before and after project status, that we hang from the aluminium construction. Furthermore we added a flyer with more detailed information about our projects for people to take with them. We finalized the exterior design by cleaning everything, placing the Brand sign and lighting up the LED’s. Finally we started a print of the backpack, so people at the fair can see the magic happen!
Project finishing:
Finish project Cover Works
Part 5: Final Design
Finish project Hardware Upgrade
Part 3: Placing the RasberryPi and adding the covers
Part 5: Adding the LED’s
Finish project Cover Works 2.0
Part 1: The raspberry Pi casing
Part 2: The vent casing
Part 3: The brand sign
(also view Hardware upgrade Part 3: Placing the RasberryPi and adding the covers)
Finish project Backpack design
Part 2: Backpack design prototype 2
Finish project Light it up!
Part 3: LED upgrade 3
(also view Hardware upgrade part 5: Adding the LED’s)
Finish project post processing program
Part 5: New g-code post processor
Part 6: Documentation
Part 1: Interface setup